DEUS / Product 01Rev. 2026-09Modular edge AI data center

AI EDGE
CUBE

Focus on AI. Leave the infrastructure to us. Power, cooling, IT, fire safety and control in a single 40-foot module — factory-built, factory-tested, connected on site.

AI EDGE CUBE cutaway: racks, cooling and power inside one 40-ft module
FIG. 1Inside one 40-ft module · cutaway render

§01Key figures

IT load
300kW
HGX B300 × 18 servers
144GPU
Per GPU rack
135kW
CDU capacity
600kW
Liquid : air
9:1
Contract → service
6mo*

* Six months assumes confirmed specs, secured power, permits and site readiness · Images are conceptual · Reference configuration as of Sept 2026

§02AI got fast. Infrastructure didn't.

DriverWhat changed
AI moves on-sitePhysical AI, real-time inference and sovereign data processing
Power & land limitsNew power and sites are hard to secure; legacy rooms fall short
Dense GPUsRising power and heat per server demand liquid cooling
TimingBuild when the GPUs arrive, not years ahead
Requirements →Fast deploymentHigh-density AIPhased growthData control

§03Six vendors. Or one.

Conventional procurement

  • C-01Designer
  • C-02Electrical
  • C-03Mechanical
  • C-04Fire
  • C-05IT vendor
  • C-06Controls SI

6 contracts · interfaces, schedule and risk sit with the owner

AI EDGE CUBE

  • C-01DEUS — design, build, test, install, handover

1 contract · 1 window · 1 accountable party

§04Five systems, one enclosure

  1. S-01POWER

    Switchgear · UPS

    UPS 400 kW IT / 300 kW cooling, Li-ion 5-min backup, single 3-phase 380 V feed

  2. S-02COOLING

    DLC + in-row air

    Cold plate 90% · air 10% (N+1), CDU 600 kW, pumps N+1

  3. S-03IT

    GPU racks 135 kW × 2

    NVIDIA HGX B300 × 18 servers · 144 GPU, infra racks 15 kW × 2

  4. S-04SAFETY

    Compartments · early detection

    Battery fire compartment, separation zone, gas suppression, fire walls

  5. S-05CONTROL

    DCIM

    Digital twin thermal & airflow, CCTV and access control

§0524–36 months → 6

M0M6M12M18M24M30M36
Conventional build
M0 · Contract & spec
M1–M3 · Factory build + site prep
M4–M5 · FAT · ship · deliver
M6 · Service start
M0Contract & specRack density and availability tier fixed; long-lead items ordered
M1–M3Factory build + site prepEnclosure, power and cooling assembled in the factory; utilities brought to site
M4–M5FAT · ship · deliverIntegrated load and cooling test, shipment, placement
M6Service startHook-up, SAT/IST, DCIM integration, handover

§06Cooling

135 kW per rack. Cold plates carry 90% of the heat; in-row units handle the rest. A dedicated 300 kW cooling UPS keeps pumps and chillers running through outages.

MethodDLC 90% · in-row 10%
CDU600 kW · pumps N+1
Cooling UPS300 kW
PipingHDPE / PP-H

§07Fire containment

Batteries live in their own fire compartment. Six layers of passive protection keep a fire where it starts; end doors allow direct external suppression.

  1. P-01Thermo Coat — intumescent shell coating
  2. P-02Internal fire protection panels
  3. P-03Rack vent fire barriers
  4. P-04Cable & busbar fire barrier sheets
  5. P-05BULLSTOP penetration blocks
  6. P-06Fire sealing gaskets on hatches and doors

§08DCIM — one control plane

MODULE-01 ......................... ONLINE
IT LOAD      286.4 kW   ████████████████░░
PUE          1.12
CDU SUPPLY   32.1 °C    OK
RACK GPU-A   131.8 kW   ████████████████▉░
RACK GPU-B   129.5 kW   ████████████████▋░
BATTERY RM   24.0 °C    OK   ·   FIRE: CLEAR
VIEW: THERMAL | MODEL | AIRFLOW | SIMULATE
CONTROL
Sensing · alarms · incident response
OPERATE
Assets · configuration · work orders
INSIGHT
AIOps · capacity · impact analysis
SECURITY
CCTV · access control · audit · RBAC

§10Reference configuration

Capacity≈ 300 kW IT load
RedundancyN baseline / N+1 · 2N by design
GPU rack135 kW × 2 (ORv3, 1400 A busbar)
Infra rack15 kW × 2
ComputeNVIDIA HGX B300 · 18 servers / 144 GPU
UPS400 kW (IT) / 300 kW (cooling)
BatteryLi-ion · 5 min · dedicated compartment
GeneratorOptional
CoolingDLC 90% (CDU 600 kW) / in-row 10% (× 4, N+1)
Power feed3-phase 380 V 60 Hz, single line
ModuleWide 40-ft-class enclosure · outdoor chiller
ScheduleContract → service ≈ 6 months*
  1. A-01

    Truly modular

    Relocate when the site changes. Lease and subscription ready.

  2. A-02

    One power feed

    A single 3-phase 380 V line feeds everything from servers to chiller.

  3. A-03

    Cooling never stops

    A dedicated 300 kW cooling UPS keeps pumps and chillers running.

  4. A-04

    Fire stays contained

    Battery compartment plus six layers of passive protection.

  5. A-05

    Your GPUs, your cloud

    Customer-chosen GPUs and stack. Air-gapped operation supported.

  6. A-06

    One contract

    Design, build, test, install and handover — one accountable partner.

Reference as of Sept 2026; subject to manufacturer changes and project conditions.

§11Built by a full-lifecycle team

10+
Data centers designed & built
15+
Feasibility & basic designs
21+
Sites reviewed

§12Proposal and quote in about two weeks

  1. 01Share requirements

    Location, available power, servers, target date

  2. 02Reference model & options

    Schedule and quote in about two weeks

  3. 03Lock spec & scope

    Supply and site-work scope agreed

  4. 04Order & start

    Long-lead equipment ordered; build starts at M0