KOR / ENG Contact sales
DEUS · Seoul · Est. 2018

Compute,
anywhere.

DEUS builds the physical layer of AI — from gigawatt campuses to a 40-foot module that goes live in six months.

Projects
64
Cluster scale
1 GW ×2
Module IT load
300 kW
Contract → live
6 mo*
Mission

AI is leaving the cloud — for the factory floor, the research lab and the forward base. We make sure the power, the cooling and the compute are already there when it arrives.

Product · 2026

AI EDGE CUBE

A complete AI data center in one 40-foot module. Power, cooling, IT, fire safety and control — built and tested in the factory, connected on site.

AI EDGE CUBE cutaway: racks, cooling and power inside one 40-ft moduleCutaway render · Reference configuration, Sept 2026
Capacity300 kW IT load
Compute144 GPU · NVIDIA HGX B300 × 18
Density135 kW per rack
Cooling90% direct-to-chip liquid · 10% in-row air
Power feedSingle 3-phase 380 V line
FireDedicated battery compartment · 6-layer passive protection
ScheduleContract to service ≈ 6 months*
Where it runs

Built for the edge of every industry.

ManufacturingReal-time AI next to the line
Public & ResearchSovereign compute for science
Finance & EnterprisePrivate AI and disaster recovery
Defense & RemoteDeploy fast. Move when needed.
Field record
64
Projects delivered (2019–2026)
10+
Data centers designed & built
15+
Feasibility studies & basic designs
21+
Sites reviewed
ProgramLocationScaleSince
East Coast DC ClusterAI data center cluster planning & development proposalGangneung · Samcheok · Donghae1 GW2025
Chuncheon K-Cloud ParkCommercialization planning · expert advisor · investment advisoryChuncheon, Gangwon240 MW2020–
Jeonnam Solaseado DC ParkCluster strategy & master planning · investment advisoryHaenam, Jeonnam1 GW2021–
All projects →
Careers

Build the physical
layer of AI.

See open roles →

Have a site?
Have power?
We'll handle the rest.

Tell us your location, available power and target date. Detailed proposal and quote in about two weeks.

* Assumes confirmed specs, secured power, permits and site readiness. Reference configuration as of Sept 2026.